Features
- 【Multifunctional Design】Vesgantti folding mattress is the ideal solution for temporary sleeping accommodation. When not used for sleep, it can be folded into a sofa position, which is very suitable for reading or playing games. Whether it is for guests staying, camping, traveling, yoga, and video gaming, Vesgantti foldable mattress is your ideal choice
- 【Portable & Easy to Store】The mattress can be folded into a compact shape in seconds for space-saving when not in use. It has two handles for you to carry, making it easier to move and use
- 【Superior Support & Comfort】Made of premium CertiPUR-US Certified foam, this mattress features a 2-Layer design that includes 3cm gel-infused memory foam and 7cm high-density base foam. The gel memory foam can effectively relieve your body pressure, and give you a cooling and cloud-like sleep experience; The high density support foam gives your body perfect support from head to toe
- 【Breathable & Washable Cover】The breathable cover is made of skin-friendly knitted fabric, which can absorb sweat and dry quickly, keeping cool after you sleep for a long time. The non-slip cloth at the bottom can prevent sliding during use. Coming with the smooth zipper, the cover of our tri-fold mattress can be quickly removed for easy washing
- 【Instructions & Service】Vesgantti folding mattress is compressed rolled, and you can easily move it and set it up in your room. It will inflate right after unpacking but please allow 24-48 hours for it to fully expand (Memory foam will expand faster in a warmer room. In cold temperatures, your mattress may take a bit longer to return to full size). If you are not satisfied for any reason, please do not hesitate to let us know
Product Description
Vesgantti Folding Mattress Small Single, 10CM Gel Memory Foam Foldable Mattress Tri-fold for Travel, Camping, Guest Bed - 100-Night Trial, CertiPUR-US Certified